Sunday, June 22, 2008

Step Two

This is a continuation of working on the second floor bathroom. At this point, we about a week from our son James and family arriving from Lithuania. Russ had to totally replumb the bathroom because the fixtures were not going to fit in the old configuration. The insulation was an attempt to stifle noise from the bathroom to our bedroom which is just the other side of the wall.
The hole in the floor is where the old tub and surround walls were that we ripped out. Russ had to do some repairs to the basic sub-floor as well as run the plumbing and wiring before he could do the sheetrock.

No comments: